New Construction of a steel framed facility over 8,000 sf, site work, supporting utilities. Multi-disciplined engineering team in design and construction. This project entailed the new construction of a Vehicle Pallet Facility on Fort Dix. It was a 31,000 sf pre-engineered Star steel building system.
Jerome Wernicki, Contracting
215-656-6614
Jerome.m.wernicki@usace.army.mil
100 Penn Square East
Philadelphia, PA 19107
Some of the design work, metal stud framing, gypsum wall board, acoustical ceilings, supervision, site maintenance.