Design-Build contract for turn key project including the design, construction, installation, implementation of energy conservation measures for the mechanical and electrical systems and the upgrade of the existing Building Automation System including measurements and verification, equipment schedules, elimination of simultaneous heating and cooling, hot and chilled water reset strategy, calibration of sensors/actuators, tower variable frequency drives, and demand control ventilation.