This Design-Build Renovation provided a complete upgrade of the State of the Art broadcast and studio facilities and associated office space. Work included the demolition of the existing offices and ceilings, retrofitting of ductwork, power, and sprinklers, replacement of floors under the raised ceiling, installation of light fixtures, conduits, wires and outlets, installation of an individual 15 ton HVAC unit connected to the building chiller system.